{"id":190,"date":"2020-03-17T11:22:58","date_gmt":"2020-03-17T11:22:58","guid":{"rendered":"https:\/\/demosites.io\/freelancer-gb\/?page_id=105"},"modified":"2022-04-10T00:52:41","modified_gmt":"2022-04-09T15:22:41","slug":"portfolio","status":"publish","type":"page","link":"https:\/\/alaia.com.au\/index.php\/portfolio\/","title":{"rendered":"Portfolio"},"content":{"rendered":"\n<div id=\"wp-block-themeisle-blocks-advanced-columns-90f4fdd1\" class=\"wp-block-themeisle-blocks-advanced-columns alignfull has-2-columns has-desktop-equal-layout has-tablet-equal-layout has-mobile-collapsedRows-layout has-reverse-columns-mobile has-vertical-center\"><div class=\"wp-block-themeisle-blocks-advanced-columns-overlay\"><\/div><div class=\"innerblocks-wrap\">\n<div id=\"wp-block-themeisle-blocks-advanced-column-4efa7d8c\" class=\"wp-block-themeisle-blocks-advanced-column\">\n<h2 id=\"wp-block-themeisle-blocks-advanced-heading-8bc387ac\" class=\"wp-block-themeisle-blocks-advanced-heading wp-block-themeisle-blocks-advanced-heading-8bc387ac\"><strong>Bondi Wastewater Treatment Plant<\/strong><br>Sydney, NSW<\/h2>\n\n\n\n<p><strong>Project Manager<\/strong> for planning (optioneering) phase<\/p>\n\n\n\n<p>Bondi Water Treatment Plant is located in North Bondi within the cliff face.&nbsp; The plant and equipment are exposed to a highly corrosive environment of Hydrogen Sulphide and high Salinity coupled with low maintenance practices has resulted in urgent upgrades to the plant.&nbsp; These projects span all areas from Inlet Works, Solids Stream and Electrical &amp; SCADA.<\/p>\n<\/div>\n\n\n\n<div id=\"wp-block-themeisle-blocks-advanced-column-ce823b08\" class=\"wp-block-themeisle-blocks-advanced-column\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/alaia.com.au\/wp-content\/uploads\/2022\/04\/Bondi-WWTPsm.jpg\" alt=\"\" class=\"wp-image-262\" width=\"395\" height=\"399\"\/><\/figure>\n<\/div>\n<\/div><\/div>\n\n\n\n<div id=\"wp-block-themeisle-blocks-advanced-columns-9166dad2\" class=\"wp-block-themeisle-blocks-advanced-columns alignfull has-2-columns has-desktop-equal-layout has-tablet-equal-layout has-mobile-collapsedRows-layout has-vertical-unset\"><div class=\"wp-block-themeisle-blocks-advanced-columns-overlay\"><\/div><div class=\"innerblocks-wrap\">\n<div id=\"wp-block-themeisle-blocks-advanced-column-d634a173\" class=\"wp-block-themeisle-blocks-advanced-column\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/alaia.com.au\/wp-content\/uploads\/2022\/04\/housing.png\" alt=\"\" class=\"wp-image-265\" width=\"372\" height=\"344\"\/><\/figure>\n<\/div>\n\n\n\n<div id=\"wp-block-themeisle-blocks-advanced-column-59d07624\" class=\"wp-block-themeisle-blocks-advanced-column\">\n<h2 id=\"wp-block-themeisle-blocks-advanced-heading-17cec6ff\" class=\"wp-block-themeisle-blocks-advanced-heading wp-block-themeisle-blocks-advanced-heading-17cec6ff\"><strong>New Dwelling<\/strong><br>Windsor Gardens SA<\/h2>\n\n\n\n<p><strong>Civil\/Structural Engineer<\/strong><\/p>\n\n\n\n<p class=\"has-neve-text-color-color has-text-color\">Full engineering design including foundations and framing.<\/p>\n\n\n\n<p class=\"has-neve-text-color-color has-text-color\">Site inspections reports<\/p>\n<\/div>\n<\/div><\/div>\n\n\n\n<div id=\"wp-block-themeisle-blocks-advanced-columns-05206699\" class=\"wp-block-themeisle-blocks-advanced-columns alignfull has-2-columns has-desktop-equal-layout has-tablet-equal-layout has-mobile-collapsedRows-layout has-vertical-unset\"><div class=\"wp-block-themeisle-blocks-advanced-columns-overlay\"><\/div><div class=\"innerblocks-wrap\">\n<div id=\"wp-block-themeisle-blocks-advanced-column-2c6e2ed8\" class=\"wp-block-themeisle-blocks-advanced-column\">\n<h2 id=\"wp-block-themeisle-blocks-advanced-heading-7857b066\" class=\"wp-block-themeisle-blocks-advanced-heading wp-block-themeisle-blocks-advanced-heading-7857b066\"><strong>Modifications of Navigable Pass and Reduced Pass, and Provision of Fishways to Locks 1 to 6<\/strong><br>River Murray, South Australia<\/h2>\n\n\n\n<p><strong>Program Manager<\/strong><\/p>\n\n\n\n<p class=\"has-neve-text-color-color has-text-color\">The project was to upgrade the navigable pass at the Locks and Weirs in South Australia and build fish passage at each location for Murray Darling Basin Authority. The objective was to remove manual tasks and requirement for divers to remove and reinstate the Nav Pass section of the weir during and post floods.&nbsp; Additionally as part of the Sea to Hume Fish Passage Program, dual fishways were constructed at each site to enable upstream fish migration around the weir.<\/p>\n<\/div>\n\n\n\n<div id=\"wp-block-themeisle-blocks-advanced-column-35447981\" class=\"wp-block-themeisle-blocks-advanced-column\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/alaia.com.au\/wp-content\/uploads\/2022\/04\/Lock-3.png\" alt=\"\" class=\"wp-image-272\" width=\"383\" height=\"408\"\/><\/figure>\n<\/div>\n<\/div><\/div>\n\n\n\n<div id=\"wp-block-themeisle-blocks-advanced-columns-b1083036\" class=\"wp-block-themeisle-blocks-advanced-columns alignfull has-2-columns has-desktop-equal-layout has-tablet-equal-layout has-mobile-collapsedRows-layout has-vertical-center\"><div class=\"wp-block-themeisle-blocks-advanced-columns-overlay\"><\/div><div class=\"innerblocks-wrap\">\n<div id=\"wp-block-themeisle-blocks-advanced-column-bfd907fc\" class=\"wp-block-themeisle-blocks-advanced-column\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/alaia.com.au\/wp-content\/uploads\/2022\/04\/1-olympic-dam.jpg\" alt=\"\" class=\"wp-image-273\" width=\"367\" height=\"261\"\/><\/figure>\n<\/div>\n\n\n\n<div id=\"wp-block-themeisle-blocks-advanced-column-56d5cc96\" class=\"wp-block-themeisle-blocks-advanced-column\">\n<h2 id=\"wp-block-themeisle-blocks-advanced-heading-cf6cdf50\" class=\"wp-block-themeisle-blocks-advanced-heading wp-block-themeisle-blocks-advanced-heading-cf6cdf50\"><strong>BHP Process Plant Upgrade (ODP2)<\/strong><br>Olympic Dam<strong> <\/strong>SA<\/h2>\n\n\n\n<p><strong>Chief Civil\/Structural Engineer<\/strong><\/p>\n\n\n\n<p class=\"has-neve-text-color-color has-text-color\">Process plant upgrade to increase production volume and changed process inline with the new mine map for Olympic Dam.&nbsp; The expansion project was a full new process facility concentrating on smelter and electro-refinery.<\/p>\n<\/div>\n<\/div><\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-templates\/template-pagebuilder-full-width.php","meta":{"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"class_list":["post-190","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/alaia.com.au\/index.php\/wp-json\/wp\/v2\/pages\/190","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alaia.com.au\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/alaia.com.au\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/alaia.com.au\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/alaia.com.au\/index.php\/wp-json\/wp\/v2\/comments?post=190"}],"version-history":[{"count":13,"href":"https:\/\/alaia.com.au\/index.php\/wp-json\/wp\/v2\/pages\/190\/revisions"}],"predecessor-version":[{"id":279,"href":"https:\/\/alaia.com.au\/index.php\/wp-json\/wp\/v2\/pages\/190\/revisions\/279"}],"wp:attachment":[{"href":"https:\/\/alaia.com.au\/index.php\/wp-json\/wp\/v2\/media?parent=190"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}